The Enlighted Plug Load Controller (PLC) transforms receptacles in 20A circuits to controlled and metered smart receptacles for energy-efficient and code-compliant plug load control.
Spec Sheets
View or download the required Spec sheet:
- PC-01-20 Spec Sheet North America
- PC-02-20 Spec Sheet Europe:
English rev.02 | German rev.02 (will be available in February 2023)
Best Practices:
- PLCs are installed near the outlet or load they control, and they must be wired properly to the outlet.
- Place the PLC in the electrical closet or near an electrical panel for easy access and visibility.
- Plug Load Controller should be installed within the gateway's wireless range and close to any sensor of the group they belong to.
- PLCs need to hear from only one sensor and do not need to hear from all sensors in the group.
- The controlling sensor should belong to the same motion group to which the Gateway is assigned. Make sure the sensor is placed near the closet.
-
For floor outlets, the PLC must not be buried in the floor.
Quick Links for Install Guides, Line Diagram, and FAQs:
- Plug Load Controller (PLC) (PC-01-20) Install Guide
- Plug Load Controller (PLC) (PC-02-20) Install Guide
- Plug Load Controller PC-xx-20 Line Diagram
- Plug Load Controller FAQs
Comments
Article is closed for comments.